In steel building installation plays a major role for strength and astatic look of the building. We give technical support and guidance to the installation team to ensure the compliance with our engineering drawing and construction details such as.
1. Installation Procedure
1.1 Preliminaries (Preliminary arrangement and safety measures)
1.2 Roof Panel installation
1.3 Fastener installation
1.4 Orientation of panels before lifting
1.5 Roof paneling sequence
1.6 Installation of the first roof panel
1.7 Sealing the side laps
1.8. Installation of remaining roof panels
1.9. Sealing the end laps
1.10. Wall panel installation
1.11. Fastener installation
1.12 Checking flatness and overhang
1.13 Positioning first panel
1.14 Positioning other panels
1.15 Checking alignment
1.16 Wall panel fixing with floor
1.17 Wall panel fixing with slab
1.18. Vertical corner closer
1.19. Skilled /Training Needed for Installation
1.20. Installation Manuals
1.21. Site Inspection (If necessary)